|
|
Project Information Details
Camino del Este Path Xing Improvements
(Design Bid Build Project)
|
|
Project Information Details
|
Camino del Este Path Xing Improvements
|
(Design Bid Build Project)
|
Print Page
|
General Information
|
|
B13088
(Transportation Asset)
|
The scope of work includes installation of two (2) High Intensity Activated crosswalks (Hawks) on Camino Del Este at the intersections with the northern bank and southern bank bike paths (along San Diego River). These installations will include a street lighting system at each crossing, pedestrian push buttons, a vehicle detection system, crosswalk and pedestrian curb ramps.
|
|
Zhang, Dayue
|
|
3
|
|
|
Project Location Map:
|
Click Here
|
Estimated Project Schedule(1)
Use mouse wheel to zoom in and out of timeline.
|
|
Schedule to be determined.
|
If timeline does not show, please click here for instructions on how to resolve this.
|
|
Estimated Project Dollar Amount(1)
|
(1)
|
$934,105
|
Construction Activity
|
(1)
|
$424,661
|
(3)
|
Fully Funded
|
|
HMS Construction, Inc.
|
(1)
|
39 Months
|
|
|
Notes:
1. The cost and schedule data shown here are the City’s current best estimates and subject to frequent change. Changes (if any) are updated once a month.
2. To learn more about Capital Improvement Projects, visit:
The Citizens Guide to the Capital Improvement Program.
3. Fully Funded means there are sufficient funds for construction phase and Partially Funded means that there are insufficient funds for construction phase.
|
For questions or concerns about the project, call the Public Works Department
construction project information line at (619) 533-4207, email
engineering@sandiego.gov,
or
submit your inquiry online.
Please reference the project name in your inquiry.
|
Form PWD1502
|
11/01/2024
|
|
|