B13157 (Sewer Asset)
Replacement of 13,200 LF (2.5 miles) of existing deteriorated sewer main with PVC pipe for system/service improvement.
Batta, Nabil
1,2,3,4,6,7,8,9
CLAIREMONT MESA; DOWNTOWN; GREATER GOLDEN HILL; LA JOLLA; MID-CITY:EASTERN AREA; MID-CITY:KENSINGTON-TALMADGE; MIDWAY-PACIFIC HIGHWAY; MIRA MESA; NAVAJO; OLD TOWN SAN DIEGO; PACIFIC BEACH; PENINSULA; SAN YSIDRO; SKYLINE-PARADISE HILLS; SOUTHEASTERN SAN D
Project Location Map: Click Here
Estimated Project Schedule(1)
Use mouse wheel to zoom in and out of timeline.

Schedule to be determined.
If timeline does not show, please click here for instructions on how to resolve this.
 
Estimated Project Dollar Amount(1)   
Costs to be determined.
 
(1) $3,855,482
Construction/Design-Build Activity
(1) $2,501,955
(3) Fully Funded
KTA Construction, Inc.
(1) 14 Months
 
Additional Remarks
None
Notes:
1. The cost and schedule data shown here are the City’s current best estimates and subject to frequent change. Changes (if any) are updated once a month.
2. To learn more about Capital Improvement Projects, visit: The Citizens Guide to the Capital Improvement Program.
3. Fully Funded means there are sufficient funds for construction phase and Partially Funded means that there are insufficient funds for construction phase.
For questions or concerns about the project, call the Public Works Department construction project information line at (619) 533-4207, email engineering@sandiego.gov, or submit your inquiry online.
Please reference the project name in your inquiry.