General Information
B14078 (Storm Water Drainage Asset)
The project area is along Jamacha Channel bound between Jamacha Road and Glencoe Drive in the upstream direction and Woodman Street and Imperial Avenue in the downstream direction. In addition, the project will be upsizing the existing 36”-48” storm drain system upstream of Beacon Drive that collects flow from Jamacha Channel. The overall goal of this study is to conduct a more in-depth evaluation of flooding issues and potential improvement alternatives for this segment of Jamacha Channel.
Dastgheibi, Sara
4
SKYLINE-PARADISE HILLS
Project Location Map: Click Here
Estimated Project Schedule(1)
Use mouse wheel to zoom in and out of timeline.
Schedule to be determined.
If timeline does not show, please click here for instructions on how to resolve this.
 
Estimated Project Dollar Amount(1)   
(1) $69,884,345
Construction Activity
(1) $42,357,168
(3) Partially Funded
To Be Selected
(1) Duration to be determined.
Additional Remarks
None
Notes:
1. The cost and schedule data shown here are the City’s current best estimates and subject to frequent change. Changes (if any) are updated once a month.
2. To learn more about Capital Improvement Projects, visit: The Citizens Guide to the Capital Improvement Program.
3. Fully Funded means there are sufficient funds for construction phase and Partially Funded means that there are insufficient funds for construction phase.
For questions or concerns about the project, call the Public Works Department construction project information line at (619) 533-4207, email engineering@sandiego.gov, or submit your inquiry online.
Please reference the project name in your inquiry.