The City of San Diego Project Information Details
Otay 2nd Pipeline Phase 1
(Design Bid Build Project)
The City of San Diego
Project Information Details
Otay 2nd Pipeline Phase 1
(Design Bid Build Project)
Print Page  
General Information
B14092 (Water Asset)
The Otay 2nd Pipeline Phase I will relocate and replace approximately 0.9 mile of existing 36-inch water transmission pipeline with new 48-inch water transmission pipeline on Woodman St. between Imperial Ave and Skyline Dr. and abandon approximately 2,200 LF of the existing 36-inch Otay 2nd Pipeline located in non-accessible areas west of Imperial Ave. Also, it will relocate the existing Pressure Regulating Valve from the Imperial Ave median to the easement south of Imperial Ave and 65th St.
Rubalcava, Eric
4
ENCANTO NEIGHBORHOODS, SKYLINE-PARADISE HILLS
Project Location Map: Click Here
Estimated Project Schedule(1)
Use mouse wheel to zoom in and out of timeline.
Schedule to be determined.
If timeline does not show, please click here for instructions on how to resolve this.
 
Estimated Project Dollar Amount(1)   
(1) $27,039,911
Construction Activity
(1) $20,154,696
(3) Fully Funded
Cass Construction, Inc.
(1) 63 Months
Additional Remarks
None
See B21084 for Transportation Asset Click Here
Notes:
1. The cost and schedule data shown here are the City’s current best estimates and subject to frequent change. Changes (if any) are updated once a month.
2. To learn more about Capital Improvement Projects, visit: The Citizens Guide to the Capital Improvement Program.
3. Fully Funded means there are sufficient funds for construction phase and Partially Funded means that there are insufficient funds for construction phase.
For questions or concerns about the project, call the Public Works Department construction project information line at (619) 533-4207, email engineering@sandiego.gov, or submit your inquiry online.
Please reference the project name in your inquiry.
Form PWD1502 11/01/2024