The City of San Diego Project Information Details
Navajo Storm Drains
(Design Bid Build Project)
The City of San Diego
Project Information Details
Navajo Storm Drains
(Design Bid Build Project)
Print Page  
General Information
B15029 (Storm Water Drainage Asset)
Replace the corrugated metal pipes of varying sizes (18” and 24”) in the Navajo Community. The CMP storm drain replacements will be on Bounty St, Formal Ct, and in open space areas between Horner St and Viar Ave with equal size reinforced concrete pipes. The work also includes the replacement of existing storm drain inlets, existing cleanouts, reconnect existing concrete brow ditches, and the restoration of affected slopes and impacted streets.
Lotfi, Elham
7
NAVAJO
Project Location Map: Click Here
Estimated Project Schedule(1)
Use mouse wheel to zoom in and out of timeline.
Schedule to be determined.
If timeline does not show, please click here for instructions on how to resolve this.
 
Estimated Project Dollar Amount(1)   
(1) $3,923,058
Construction Activity
(1) $2,100,400
(3) Partially Funded
To Be Selected
(1) Duration to be determined.
Additional Remarks
None
Notes:
1. The cost and schedule data shown here are the City’s current best estimates and subject to frequent change. Changes (if any) are updated once a month.
2. To learn more about Capital Improvement Projects, visit: The Citizens Guide to the Capital Improvement Program.
3. Fully Funded means there are sufficient funds for construction phase and Partially Funded means that there are insufficient funds for construction phase.
For questions or concerns about the project, call the Public Works Department construction project information line at (619) 533-4207, email engineering@sandiego.gov, or submit your inquiry online.
Please reference the project name in your inquiry.
Form PWD1502 04/01/2024