Project Information Details
PWP Morena Conveyance
(Design Bid Build Project)
|
|
Project Information Details
|
PWP Morena Conveyance
|
(Design Bid Build Project)
|
Print Page
|
General Information
|
|
B15141
(Sewer Asset)
|
Flow from several Interceptors and Trunk Sewers will be diverted to the proposed Morena Sewer Pump Station (MPS) which will be located at the intersection of Sherman and Custer Streets. A 48-inch force main will deliver an average of 32 mgd of raw wastewater from the MPS 11 miles North to the North City Water Reclamation Plant (NCWRP). The force main will be steel pipe for first 3 miles, then changing to HDPE pipe for the remaining 8 miles.
|
|
Tadros, Sameh
|
|
3, 6, 7, 2
|
|
|
Project Location Map:
|
Click Here
|
Estimated Project Schedule(1)
Use mouse wheel to zoom in and out of timeline.
|
|
Schedule to be determined.
|
If timeline does not show, please click here for instructions on how to resolve this.
|
|
Estimated Project Dollar Amount(1)
|
(1)
|
$309,796,897
|
Construction Activity
|
(1)
|
$247,292,130
|
(3)
|
Fully Funded
|
|
OHL Construction
|
(1)
|
54 Months
|
|
|
See B15141.2 for Sewer Asset
Click Here
|
See B15141.4 for Sewer Asset
Click Here
|
Notes:
1. The cost and schedule data shown here are the City’s current best estimates and subject to frequent change. Changes (if any) are updated once a month.
2. To learn more about Capital Improvement Projects, visit:
The Citizens Guide to the Capital Improvement Program.
3. Fully Funded means there are sufficient funds for construction phase and Partially Funded means that there are insufficient funds for construction phase.
|
For questions or concerns about the project, call the Public Works Department
construction project information line at (619) 533-4207, email
engineering@sandiego.gov,
or
submit your inquiry online.
Please reference the project name in your inquiry.
|
Form PWD1502
|
11/01/2024
|
|
|