The City of San Diego Project Information Details
Priority Sewer Main Replacement Group 16
(Design Build Project)
The City of San Diego
Project Information Details
Priority Sewer Main Replacement Group 16
(Design Build Project)
Print Page  
General Information
B16018 (Sewer Asset)
Replacement of 11,563 LF (.99 mi) of existing 6” – 24” CP & VC sewer mains which are included on the Wastewater Collection’s referral list and have been recommended for replacement. Included the replacement of associated sewer laterals, sewer manhole, curb ramps, and other appurtenances.
Ramos-Banuelos, Jaime
1, 3, 8, 7, 9, 2, 4
NORTH PARK, OTAY MESA-NESTOR, OLD TOWN SAN DIEGO, LA JOLLA, DOWNTOWN, SAN YSIDRO, MID-CITY:EASTERN AREA, MISSION VALLEY, MIDWAY-PACIFIC HIGHWAY, MID-CITY:CITY HEIGHTS, PENINSULA, PACIFIC BEACH, ENCANTO NEIGHBORHOODS, UPTOWN, MID-CITY:NORMAL HEIGHTS, MISSION BEACH, SOUTHEASTERN SAN DIEGO
Project Location Map: Click Here
Estimated Project Schedule(1)
Use mouse wheel to zoom in and out of timeline.
Schedule to be determined.
If timeline does not show, please click here for instructions on how to resolve this.
 
Estimated Project Dollar Amount(1)   
(1) $10,148,218
Design-Build Activity
(1) $8,441,537
(3) Fully Funded
TC Construction Co., Inc.
(1) 61 Months
Additional Remarks
None
Notes:
1. The cost and schedule data shown here are the City’s current best estimates and subject to frequent change. Changes (if any) are updated once a month.
2. To learn more about Capital Improvement Projects, visit: The Citizens Guide to the Capital Improvement Program.
3. Fully Funded means there are sufficient funds for construction phase and Partially Funded means that there are insufficient funds for construction phase.
For questions or concerns about the project, call the Public Works Department construction project information line at (619) 533-4207, email engineering@sandiego.gov, or submit your inquiry online.
Please reference the project name in your inquiry.
Form PWD1502 11/01/2024