Project Information Details
El Cajon Bl-Highland-58th Improv (VZ)
(Design Bid Build Project)
|
|
Project Information Details
|
El Cajon Bl-Highland-58th Improv (VZ)
|
(Design Bid Build Project)
|
Print Page
|
General Information
|
|
B17003
(Transportation Asset)
|
The project will improve pedestrian access along El Cajon Boulevard from Highland Avenue to Chamoune Avenue and will include constructing raised medians, curb extensions, curb ramps, curb and gutter, sidewalk, bus pad, loop detectors, continental crosswalks, striping, and pavement markings, temporary traffic control, Hybrid Pedestrian Crossing Systems (HAWK) at El Cajon Boulevard and 45th Street, and install street lighting along El Cajon Boulevard under WBS B-21065.
|
|
Rekani, Ronak
|
|
9
|
|
|
Project Location Map:
|
Click Here
|
Estimated Project Schedule(1)
Use mouse wheel to zoom in and out of timeline.
|
|
Schedule to be determined.
|
If timeline does not show, please click here for instructions on how to resolve this.
|
|
Estimated Project Dollar Amount(1)
|
(1)
|
$1,578,000
|
Construction Activity
|
(1)
|
$613,647
|
(3)
|
Fully Funded
|
|
HMS Construction, Inc.
|
(1)
|
21 Months
|
|
|
Notes:
1. The cost and schedule data shown here are the City’s current best estimates and subject to frequent change. Changes (if any) are updated once a month.
2. To learn more about Capital Improvement Projects, visit:
The Citizens Guide to the Capital Improvement Program.
3. Fully Funded means there are sufficient funds for construction phase and Partially Funded means that there are insufficient funds for construction phase.
|
For questions or concerns about the project, call the Public Works Department
construction project information line at (619) 533-4207, email
engineering@sandiego.gov,
or
submit your inquiry online.
Please reference the project name in your inquiry.
|
Form PWD1502
|
11/01/2024
|
|
|