Project Information Details
Remaining Small Diameter CI Water Ph 3
(Design Bid Build Project)
|
|
Project Information Details
|
Remaining Small Diameter CI Water Ph 3
|
(Design Bid Build Project)
|
Print Page
|
General Information
|
|
B17091
(Water Asset)
|
This project is located City-wide in Council districts 1,2,3,4, & 7. The project scope includes the replacement, re-alignment, and new construction of approximately 8681 LF (1.64 miles) of water main. The scope also includes the replacement of associated water services, fire hydrants, and curb ramps.
The project will also abandon approximately 3400 LF ( .64 miles) of existing deteriorated cast Iron water main.
|
|
Vitelle, Brian
|
|
1, 3, 7, 2, 4
|
|
|
Project Location Map:
|
Click Here
|
Estimated Project Schedule(1)
Use mouse wheel to zoom in and out of timeline.
|
|
Schedule to be determined.
|
If timeline does not show, please click here for instructions on how to resolve this.
|
|
Estimated Project Dollar Amount(1)
|
(1)
|
$5,677,283
|
Construction Activity
|
(1)
|
$4,332,299
|
(3)
|
Fully Funded
|
|
Burtech Pipeline, Incorporated
|
(1)
|
38 Months
|
|
|
Notes:
1. The cost and schedule data shown here are the City’s current best estimates and subject to frequent change. Changes (if any) are updated once a month.
2. To learn more about Capital Improvement Projects, visit:
The Citizens Guide to the Capital Improvement Program.
3. Fully Funded means there are sufficient funds for construction phase and Partially Funded means that there are insufficient funds for construction phase.
|
For questions or concerns about the project, call the Public Works Department
construction project information line at (619) 533-4207, email
engineering@sandiego.gov,
or
submit your inquiry online.
Please reference the project name in your inquiry.
|
Form PWD1502
|
11/01/2024
|
|
|