|
|
Project Information Details
Curb Ramp Improvement Group 1701
(Design Bid Build Project)
|
|
Project Information Details
|
Curb Ramp Improvement Group 1701
|
(Design Bid Build Project)
|
Print Page
|
General Information
|
|
B17114
(Transportation Asset)
|
This project will improve accessibility to sidewalk in Downtown San Diego. The project proposes the installation of new curb ramps in compliance with ADA requirements within the Right of Way. Asphalt Resurfacing, repair, restoration, traffic loop detector replacement as relates to installation of curb ramp, crosswalk striping (if any). Relocation or installation of pedestrian push button (PPB) pedestal; trenching, installing new electrical conduits, and pull boxes.
|
|
Barhoumi, Zach
|
|
3, 8, 2
|
|
|
Project Location Map:
|
Click Here
|
Estimated Project Schedule(1)
Use mouse wheel to zoom in and out of timeline.
|
|
Schedule to be determined.
|
If timeline does not show, please click here for instructions on how to resolve this.
|
|
Estimated Project Dollar Amount(1)
|
(1)
|
$3,957,866
|
Construction Activity
|
(1)
|
$1,549,229
|
(3)
|
Fully Funded
|
|
L.C. Paving & Sealing, Inc.
|
(1)
|
31 Months
|
|
|
Notes:
1. The cost and schedule data shown here are the City’s current best estimates and subject to frequent change. Changes (if any) are updated once a month.
2. To learn more about Capital Improvement Projects, visit:
The Citizens Guide to the Capital Improvement Program.
3. Fully Funded means there are sufficient funds for construction phase and Partially Funded means that there are insufficient funds for construction phase.
|
For questions or concerns about the project, call the Public Works Department
construction project information line at (619) 533-4207, email
engineering@sandiego.gov,
or
submit your inquiry online.
Please reference the project name in your inquiry.
|
Form PWD1502
|
11/01/2024
|
|
|