The City of San Diego Project Information Details
AC Water & Sewer Group 1050 (W)
(Design Bid Build Project)
The City of San Diego
Project Information Details
AC Water & Sewer Group 1050 (W)
(Design Bid Build Project)
Print Page  
General Information
B18090 (Water Asset)
Construction of approximately 17,029 linear feet (LF) (3.23 miles) of polyvinyl chloride (PVC) water mains to replace existing 4-, 6-, 8-, 10-, 12-, 16-, & 20-inch diameter asbestos cement (AC) water mains via open trench within the same alignment at the same or shallower depth, including all associated water services, fire hydrants, valves, water meters, and other appurtenances.
Ramos-Banuelos, Jaime
7, 9, 2
MIDWAY-PACIFIC HIGHWAY, MID-CITY:CITY HEIGHTS, NAVAJO
Project Location Map: Click Here
Estimated Project Schedule(1)
Use mouse wheel to zoom in and out of timeline.
Schedule to be determined.
If timeline does not show, please click here for instructions on how to resolve this.
 
Estimated Project Dollar Amount(1)   
(1) $11,903,910
Construction Activity
(1) $9,877,738
(3) Fully Funded
Burtech Pipeline, Incorporated
(1) 29 Months
Additional Remarks
None
See B24091 for Transportation Asset Click Here
See B18094 for Sewer Asset Click Here
Notes:
1. The cost and schedule data shown here are the City’s current best estimates and subject to frequent change. Changes (if any) are updated once a month.
2. To learn more about Capital Improvement Projects, visit: The Citizens Guide to the Capital Improvement Program.
3. Fully Funded means there are sufficient funds for construction phase and Partially Funded means that there are insufficient funds for construction phase.
For questions or concerns about the project, call the Public Works Department construction project information line at (619) 533-4207, email engineering@sandiego.gov, or submit your inquiry online.
Please reference the project name in your inquiry.
Form PWD1502 11/01/2024