|
|
Project Information Details
AC Water & Sewer Group 1051 (W)
(Design Bid Build Project)
|
|
Project Information Details
|
AC Water & Sewer Group 1051 (W)
|
(Design Bid Build Project)
|
Print Page
|
General Information
|
|
B18091
(Water Asset)
|
Construction of approximately 2,082 linear feet (LF) (0.39 miles) of polyvinyl chloride (PVC) water mains to replace existing 4-, 6-, and 8-inch diameter asbestos cement (AC) water mains via open trench within the same trench alignment at the same or shallower depth, including associated water services, fire hydrants, valves, water meters, and other appurtenances.
|
|
Ramos-Banuelos, Jaime
|
|
7
|
|
|
Project Location Map:
|
Click Here
|
Estimated Project Schedule(1)
Use mouse wheel to zoom in and out of timeline.
|
|
Schedule to be determined.
|
If timeline does not show, please click here for instructions on how to resolve this.
|
|
Estimated Project Dollar Amount(1)
|
(1)
|
$2,141,334
|
Construction Activity
|
(1)
|
$1,140,590
|
(3)
|
Fully Funded
|
|
Burtech Pipeline, Incorporated
|
(1)
|
34 Months
|
|
|
See B18098 for Sewer Asset
Click Here
|
See B19145 for Sewer Asset
Click Here
|
Notes:
1. The cost and schedule data shown here are the City’s current best estimates and subject to frequent change. Changes (if any) are updated once a month.
2. To learn more about Capital Improvement Projects, visit:
The Citizens Guide to the Capital Improvement Program.
3. Fully Funded means there are sufficient funds for construction phase and Partially Funded means that there are insufficient funds for construction phase.
|
For questions or concerns about the project, call the Public Works Department
construction project information line at (619) 533-4207, email
engineering@sandiego.gov,
or
submit your inquiry online.
Please reference the project name in your inquiry.
|
Form PWD1502
|
11/01/2024
|
|
|