General Information
B18114 (Water Asset)
Construction of approximately 3,651.44 linear feet (0.69 miles) of PVC water mains to replace existing 12-inch asbestos cement (AC) water mains via open trench and trenchless methods. Including all associate water services, fire hydrants, valves, water meters, and other appurtenances.
Construction of approximately 9,735.89 linear feet (1.84 miles) of polyvinyl chloride (PVC) sewer mains to replace existing 6, 8, 10, and 14-inch diameter vitrified clay (VC) and concrete pipe (CP) sewer mains via
Narvaez, Rex
3
DOWNTOWN
Project Location Map: Click Here
Estimated Project Schedule(1)
Use mouse wheel to zoom in and out of timeline.
Schedule to be determined.
If timeline does not show, please click here for instructions on how to resolve this.
 
Estimated Project Dollar Amount(1)   
(1) $2,367,822
Design-Build Activity
(1) $1,493,800
(3) Partially Funded
To Be Selected
(1) Duration to be determined.
Additional Remarks
None
See B18111 for Sewer Asset Click Here
Notes:
1. The cost and schedule data shown here are the City’s current best estimates and subject to frequent change. Changes (if any) are updated once a month.
2. To learn more about Capital Improvement Projects, visit: The Citizens Guide to the Capital Improvement Program.
3. Fully Funded means there are sufficient funds for construction phase and Partially Funded means that there are insufficient funds for construction phase.
For questions or concerns about the project, call the Public Works Department construction project information line at (619) 533-4207, email engineering@sandiego.gov, or submit your inquiry online.
Please reference the project name in your inquiry.