Project Information Details
Sewer & AC Water Group 1055 (W)
(Design Bid Build Project)
|
|
Project Information Details
|
Sewer & AC Water Group 1055 (W)
|
(Design Bid Build Project)
|
Print Page
|
General Information
|
|
B18115
(Water Asset)
|
Replace approximately 6,293 linear feet (LF) (1.19 miles) of existing 6, 8, 12 and 16-inch diameter asbestos cement (AC) and Ductile Iron (DI) water pipes with 8, 12, and 16-inch Polyvinyl Chloride (PVC) pipes. Abandon 94 linear feet (0.01 miles) of 4-inch diameter Cast Iron (CI) water pipes.
|
|
Narvaez, Rex
|
|
3
|
|
|
Project Location Map:
|
Click Here
|
Estimated Project Schedule(1)
Use mouse wheel to zoom in and out of timeline.
|
|
Schedule to be determined.
|
If timeline does not show, please click here for instructions on how to resolve this.
|
|
Estimated Project Dollar Amount(1)
|
(1)
|
$3,924,495
|
Construction Activity
|
(1)
|
$2,509,000
|
(3)
|
Partially Funded
|
|
To Be Selected
|
(1)
|
Duration to be determined.
|
|
|
See B18112 for Sewer Asset
Click Here
|
Notes:
1. The cost and schedule data shown here are the City’s current best estimates and subject to frequent change. Changes (if any) are updated once a month.
2. To learn more about Capital Improvement Projects, visit:
The Citizens Guide to the Capital Improvement Program.
3. Fully Funded means there are sufficient funds for construction phase and Partially Funded means that there are insufficient funds for construction phase.
|
For questions or concerns about the project, call the Public Works Department
construction project information line at (619) 533-4207, email
engineering@sandiego.gov,
or
submit your inquiry online.
Please reference the project name in your inquiry.
|