|
|
Project Information Details
South Mission Beach GI
(Design Bid Build Project)
|
|
Project Information Details
|
South Mission Beach GI
|
(Design Bid Build Project)
|
Print Page
|
General Information
|
|
B18118
(Storm Water Drainage Asset)
|
INSTALLATION OF STORM DRAIN, BIOFILTRATION AND INFILTRATION BASINS, LOW FLOW DIVERSION STRUCTURES, AND STREET RESURFACING THROUGHOUT VARIOUS SECTIONS OF SOUTH MISSION BEACH INCLUDING MISSION BOULEVARD, SAN FERNANDO PLACE, SAN GABRIEL PLACE, CAPISTRANO PLACE, COHASSET COURT, AND BALBOA COURT. CONSTRUCTION CONSISTS OF STORM DRAIN LATERALS THROUGH THE ALLEY SECTIONS ALONG MISSION BOULEVARD. THE PIPE SIZE INSTALLATION WILL RANGE FROM 48 INCHES, 36 INCHES, 30 INCHES, 24 INCHES, 18 INCHES, AND 15 INCH
|
|
Straughn, Jayna
|
|
2
|
|
|
Project Location Map:
|
Click Here
|
Estimated Project Schedule(1)
Use mouse wheel to zoom in and out of timeline.
|
|
Schedule to be determined.
|
If timeline does not show, please click here for instructions on how to resolve this.
|
|
Estimated Project Dollar Amount(1)
|
(1)
|
$10,973,869
|
Construction Activity
|
(1)
|
$7,813,062
|
(3)
|
Partially Funded
|
|
To Be Selected
|
(1)
|
Duration to be determined.
|
|
|
See B18117 for Storm Water Drainage Asset
Click Here
|
See B23088 for Transportation Asset
Click Here
|
Notes:
1. The cost and schedule data shown here are the City’s current best estimates and subject to frequent change. Changes (if any) are updated once a month.
2. To learn more about Capital Improvement Projects, visit:
The Citizens Guide to the Capital Improvement Program.
3. Fully Funded means there are sufficient funds for construction phase and Partially Funded means that there are insufficient funds for construction phase.
|
For questions or concerns about the project, call the Public Works Department
construction project information line at (619) 533-4207, email
engineering@sandiego.gov,
or
submit your inquiry online.
Please reference the project name in your inquiry.
|
Form PWD1502
|
11/01/2024
|
|
|