The City of San Diego Project Information Details
AC Water & Sewer Group 1036 (S)
(Design Bid Build Project)
The City of San Diego
Project Information Details
AC Water & Sewer Group 1036 (S)
(Design Bid Build Project)
Print Page  
General Information
B18123 (Sewer Asset)
The new scope adds 1,330LF ¿0.25 mi¿ of 8” sewer main replacement. Construction of approximately 755 LF (0.14 miles) of PVC sewer mains to replace existing 8-, 10- and 12 inch diameter vitrified clay (VC) sewer mains via open trench within the same trench alignment at the same or shallower depth, including associated laterals, manholes, cleanouts, and appurtenances, and associated street resurfacing.
Narvaez, Rex
1, 9
MISSION BAY PARK, PACIFIC BEACH, COLLEGE AREA
Project Location Map: Click Here
Estimated Project Schedule(1)
Use mouse wheel to zoom in and out of timeline.
Schedule to be determined.
If timeline does not show, please click here for instructions on how to resolve this.
 
Estimated Project Dollar Amount(1)   
(1) $2,214,577
Construction Activity
(1) $1,433,297
(3) Fully Funded
Palm Engineering Construction Company, Inc.
(1) 31 Months
Additional Remarks
None
See B18121 for Water Asset Click Here
See B23094 for Transportation Asset Click Here
Notes:
1. The cost and schedule data shown here are the City’s current best estimates and subject to frequent change. Changes (if any) are updated once a month.
2. To learn more about Capital Improvement Projects, visit: The Citizens Guide to the Capital Improvement Program.
3. Fully Funded means there are sufficient funds for construction phase and Partially Funded means that there are insufficient funds for construction phase.
For questions or concerns about the project, call the Public Works Department construction project information line at (619) 533-4207, email engineering@sandiego.gov, or submit your inquiry online.
Please reference the project name in your inquiry.
Form PWD1502 11/01/2024