|
|
Project Information Details
Tecolote North Parking Lot Improvements
(Design Bid Build Project)
|
|
Project Information Details
|
Tecolote North Parking Lot Improvements
|
(Design Bid Build Project)
|
Print Page
|
General Information
|
|
B18231
(Parks Asset)
|
The adjacent parking lot is to be resurfaced and new accessible parking spaces and curb ramps installed. This may include a reconfiguration of the parking striping, revised planter islands (existing trees to be preserved), and storm water treatment BMPs. The path of travel from the parking lot to the playground will need to be modified to address accessibility. Either existing walkways will need to be removed and replace to address cross slope issues or a new path from the parking lot will nee
|
|
Oliver, Kevin
|
|
2
|
|
|
Project Location Map:
|
Click Here
|
Estimated Project Schedule(1)
Use mouse wheel to zoom in and out of timeline.
|
|
Schedule to be determined.
|
If timeline does not show, please click here for instructions on how to resolve this.
|
|
Estimated Project Dollar Amount(1)
|
(1)
|
$869,000
|
Construction Activity
|
(1)
|
$400,000
|
(3)
|
Fully Funded
|
|
Dick Miller, Inc.
|
(1)
|
19 Months
|
|
|
See B19015 for Parks Asset
Click Here
|
See B19017 for Parks Asset
Click Here
|
Notes:
1. The cost and schedule data shown here are the City’s current best estimates and subject to frequent change. Changes (if any) are updated once a month.
2. To learn more about Capital Improvement Projects, visit:
The Citizens Guide to the Capital Improvement Program.
3. Fully Funded means there are sufficient funds for construction phase and Partially Funded means that there are insufficient funds for construction phase.
|
For questions or concerns about the project, call the Public Works Department
construction project information line at (619) 533-4207, email
engineering@sandiego.gov,
or
submit your inquiry online.
Please reference the project name in your inquiry.
|
Form PWD1502
|
11/01/2024
|
|
|