|
|
Project Information Details
Sidewalk Replacement Group 1901-NP & OB
(Design Bid Build Project)
|
|
Project Information Details
|
Sidewalk Replacement Group 1901-NP & OB
|
(Design Bid Build Project)
|
Print Page
|
General Information
|
|
B19012
(Transportation Asset)
|
Work will involve furnishing all labor, materials, equipment, services and construction, including but not limited to demolishing, hauling and disposal of the existing asphalt and concrete, removal and replacement of damaged sidewalk including root removal where applicable, curb and gutter, PCC Residential Driveways, cross gutter removal and replacement, installation of curb ramps to meet ADA standards, installation and replacement of curb outlet – type A, excavation of unsuitable base materials
|
|
Hoenes, Craig
|
|
Geo-Mapping is in progress
|
|
|
Project Location Map:
|
Click Here
|
Estimated Project Schedule(1)
Use mouse wheel to zoom in and out of timeline.
|
|
Schedule to be determined.
|
If timeline does not show, please click here for instructions on how to resolve this.
|
|
Estimated Project Dollar Amount(1)
|
(1)
|
$1,996,022
|
Construction Activity
|
(1)
|
$888,152
|
(3)
|
Fully Funded
|
|
Jerusalem Construction, Inc.
|
(1)
|
18 Months
|
|
|
Notes:
1. The cost and schedule data shown here are the City’s current best estimates and subject to frequent change. Changes (if any) are updated once a month.
2. To learn more about Capital Improvement Projects, visit:
The Citizens Guide to the Capital Improvement Program.
3. Fully Funded means there are sufficient funds for construction phase and Partially Funded means that there are insufficient funds for construction phase.
|
For questions or concerns about the project, call the Public Works Department
construction project information line at (619) 533-4207, email
engineering@sandiego.gov,
or
submit your inquiry online.
Please reference the project name in your inquiry.
|
Form PWD1502
|
11/01/2024
|
|
|