The City of San Diego Project Information Details
Accelerated Sewer Referral Group 852
(Design Bid Build Project)
The City of San Diego
Project Information Details
Accelerated Sewer Referral Group 852
(Design Bid Build Project)
Print Page  
General Information
B19064 (Sewer Asset)
The project consists of replacing approximately 0.70 miles of
existing 6, 8, and 10-inch vitrified clay, concrete, and polyvinyl chloride ¿PVC ¿sewer mains with new 8 and 10-inch PVC pipes. Additionally, PUD is requesting the replacement of 12 isolated manholes. Service laterals that connect to the sewer main will be replaced. The mains selected for replacement were identified in areas under a trench cut moratorium, or areas that will require additional environmental permitting per CEQA
Narvaez, Rex
3, 6, 8, 7, 5, 2, 4
NORTH PARK, TIERRASANTA, DOWNTOWN, CLAIREMONT MESA, PENINSULA, ENCANTO NEIGHBORHOODS, NAVAJO, UPTOWN, MIRA MESA
Project Location Map: Click Here
Estimated Project Schedule(1)
Use mouse wheel to zoom in and out of timeline.
Schedule to be determined.
If timeline does not show, please click here for instructions on how to resolve this.
 
Estimated Project Dollar Amount(1)   
(1) $2,609,600
Construction Activity
(1) $1,573,000
(3) Partially Funded
To be selected
(1) Duration to be determined.
Additional Remarks
None
Notes:
1. The cost and schedule data shown here are the City’s current best estimates and subject to frequent change. Changes (if any) are updated once a month.
2. To learn more about Capital Improvement Projects, visit: The Citizens Guide to the Capital Improvement Program.
3. Fully Funded means there are sufficient funds for construction phase and Partially Funded means that there are insufficient funds for construction phase.
For questions or concerns about the project, call the Public Works Department construction project information line at (619) 533-4207, email engineering@sandiego.gov, or submit your inquiry online.
Please reference the project name in your inquiry.
Form PWD1502 10/01/2024