|
|
Project Information Details
Rose Marie Starns Parking Lot Imprvemts
(Job Order Contract Project)
|
|
Project Information Details
|
Rose Marie Starns Parking Lot Imprvemts
|
(Job Order Contract Project)
|
Print Page
|
General Information
|
|
B19163
(Parks Asset)
|
This project provides for the repair, resurfacing, design and construction of the Rose Marie Starns South Shores parking lot and associated accessible parking space and curb ramps improvements. Approximately 365,000 sq ft area of grind and overlay ¿minimum amount to be determined based upon the recommendation from the final geotechnical study and consultant design¿. An extension of the existing concrete boat launch area in the parking lot approximately 4,000 square feet will require a fully dept
|
|
Schroth-Nichols, Elizabeth
|
|
2
|
|
|
Project Location Map:
|
Click Here
|
Estimated Project Schedule(1)
Use mouse wheel to zoom in and out of timeline.
|
|
Schedule to be determined.
|
If timeline does not show, please click here for instructions on how to resolve this.
|
|
Estimated Project Dollar Amount(1)
|
(1)
|
$4,044,832
|
Construction Activity
|
(1)
|
$2,981,811
|
(3)
|
Partially Funded
|
|
To be selected
|
(1)
|
Duration to be determined.
|
|
|
Notes:
1. The cost and schedule data shown here are the City’s current best estimates and subject to frequent change. Changes (if any) are updated once a month.
2. To learn more about Capital Improvement Projects, visit:
The Citizens Guide to the Capital Improvement Program.
3. Fully Funded means there are sufficient funds for construction phase and Partially Funded means that there are insufficient funds for construction phase.
|
For questions or concerns about the project, call the Public Works Department
construction project information line at (619) 533-4207, email
engineering@sandiego.gov,
or
submit your inquiry online.
Please reference the project name in your inquiry.
|
Form PWD1502
|
11/01/2024
|
|
|