The City of San Diego Project Information Details
Rose Marie Starns Parking Lot Imprvemts
(Job Order Contract Project)
The City of San Diego
Project Information Details
Rose Marie Starns Parking Lot Imprvemts
(Job Order Contract Project)
Print Page  
General Information
B19163 (Parks Asset)
This project provides for the repair, resurfacing, design and construction of the Rose Marie Starns South Shores parking lot and associated accessible parking space and curb ramps improvements.
Approximately 365,000 sq ft area of grind and overlay ¿minimum amount to be determined based upon the recommendation from the final geotechnical study and consultant design¿. An extension of the existing concrete boat launch area in the parking lot approximately 4,000 square feet will require a fully dept
Schroth-Nichols, Elizabeth
2
MISSION BAY PARK
Project Location Map: Click Here
Estimated Project Schedule(1)
Use mouse wheel to zoom in and out of timeline.
Schedule to be determined.
If timeline does not show, please click here for instructions on how to resolve this.
 
Estimated Project Dollar Amount(1)   
(1) $4,044,832
Construction Activity
(1) $2,981,811
(3) Partially Funded
To be selected
(1) Duration to be determined.
Additional Remarks
None
Notes:
1. The cost and schedule data shown here are the City’s current best estimates and subject to frequent change. Changes (if any) are updated once a month.
2. To learn more about Capital Improvement Projects, visit: The Citizens Guide to the Capital Improvement Program.
3. Fully Funded means there are sufficient funds for construction phase and Partially Funded means that there are insufficient funds for construction phase.
For questions or concerns about the project, call the Public Works Department construction project information line at (619) 533-4207, email engineering@sandiego.gov, or submit your inquiry online.
Please reference the project name in your inquiry.
Form PWD1502 11/01/2024