The City of San Diego Project Information Details
AC Water & Sewer Group 1052A (S)
(Design Build Project)
The City of San Diego
Project Information Details
AC Water & Sewer Group 1052A (S)
(Design Build Project)
Print Page  
General Information
B19169 (Sewer Asset)
Replacement of approx 2,315 linear feet (LF) (0.44 miles) of existing 6 and 8 inch diameter Vitrified Clay (VC), Concrete (CP) and Polyvinyl Chloride (PVC) pipes sewer pipes with PVC pipes.
Construct approximately 1,041 LF (0.2 miles) of 8 inch PVC new sewer mains. Abandon approximately 1,008 linear feet (LF) (0.19 miles) of existing 6 and 8 inch concrete (CP), PVC and Vitrified Clay (VC) sewer pipes. Rehab approx 310 linear feet (LF) (0.06 miles) of existing 8 inch diameter Vitrified Clay (VC)
Ammerlahn, Parita
8, 4
SOUTHEASTERN SAN DIEGO
Project Location Map: Click Here
Estimated Project Schedule(1)
Use mouse wheel to zoom in and out of timeline.
Schedule to be determined.
If timeline does not show, please click here for instructions on how to resolve this.
 
Estimated Project Dollar Amount(1)   
(1) $3,312,314
Design-Build Activity
(1) $2,122,314
(3) Fully Funded
TC Construction Co., Inc.
(1) 25 Months
Additional Remarks
None
See B24059 for Transportation Asset Click Here
See B19166 for Water Asset Click Here
Notes:
1. The cost and schedule data shown here are the City’s current best estimates and subject to frequent change. Changes (if any) are updated once a month.
2. To learn more about Capital Improvement Projects, visit: The Citizens Guide to the Capital Improvement Program.
3. Fully Funded means there are sufficient funds for construction phase and Partially Funded means that there are insufficient funds for construction phase.