General Information
|
|
B19169
(Sewer Asset)
|
Replacement of approx 2,315 linear feet (LF) (0.44 miles) of existing 6 and 8 inch diameter Vitrified Clay (VC), Concrete (CP) and Polyvinyl Chloride (PVC) pipes sewer pipes with PVC pipes. Construct approximately 1,041 LF (0.2 miles) of 8 inch PVC new sewer mains. Abandon approximately 1,008 linear feet (LF) (0.19 miles) of existing 6 and 8 inch concrete (CP), PVC and Vitrified Clay (VC) sewer pipes. Rehab approx 310 linear feet (LF) (0.06 miles) of existing 8 inch diameter Vitrified Clay (VC)
|
|
Rubalcava, Eric
|
|
8, 4
|
|
|
Project Location Map:
|
Click Here
|
Estimated Project Schedule(1)
Use mouse wheel to zoom in and out of timeline.
|
|
Schedule to be determined.
|
If timeline does not show, please click here for instructions on how to resolve this.
|
|
Estimated Project Dollar Amount(1)
|
(1)
|
$3,312,314
|
Design-Build Activity
|
(1)
|
$2,122,314
|
(3)
|
Fully Funded
|
|
TC Construction Co., Inc.
|
(1)
|
28 Months
|
|
|
See B24059 for Transportation Asset
Click Here
|
See B19166 for Water Asset
Click Here
|
Notes:
1. The cost and schedule data shown here are the City’s current best estimates and subject to frequent change. Changes (if any) are updated once a month.
2. To learn more about Capital Improvement Projects, visit:
The Citizens Guide to the Capital Improvement Program.
3. Fully Funded means there are sufficient funds for construction phase and Partially Funded means that there are insufficient funds for construction phase.
|
For questions or concerns about the project, call the Public Works Department
construction project information line at (619) 533-4207, email
engineering@sandiego.gov,
or
submit your inquiry online.
Please reference the project name in your inquiry.
|
Form PWD1502
|