|
|
Project Information Details
Crest Canyon Park Emergency SD Replace
(Emergency (Std, as-needed) Project)
|
|
Project Information Details
|
Crest Canyon Park Emergency SD Replace
|
(Emergency (Std, as-needed) Project)
|
Print Page
|
General Information
|
|
B20019
(Storm Water Drainage Asset)
|
The project includes replacement of the existing corrugated metal pipe, CMP, storm drain system. The existing storm drain system consist of the following; 2800 feet of 54-inch CMP, 800 feet of 48-inch CMP, 400 feet of 42-inch CMP, 320 feet of 30-inch CMP, 380 feet of 24-inch CMP and storm drain system appurtenances. Additional work includes but not limited to; design services, survey services, biological monitoring, archeological & Native American monitoring, paleontological monitoring, install
|
|
Choi, Jong
|
|
1
|
|
|
Project Location Map:
|
Click Here
|
Estimated Project Schedule(1)
Use mouse wheel to zoom in and out of timeline.
|
|
Schedule to be determined.
|
If timeline does not show, please click here for instructions on how to resolve this.
|
|
Estimated Project Dollar Amount(1)
|
(1)
|
$9,395,495
|
Construction Activity
|
(1)
|
$7,862,315
|
(3)
|
Fully Funded
|
|
Burtech Pipeline, Incorporated
|
(1)
|
21 Months
|
|
|
Notes:
1. The cost and schedule data shown here are the City’s current best estimates and subject to frequent change. Changes (if any) are updated once a month.
2. To learn more about Capital Improvement Projects, visit:
The Citizens Guide to the Capital Improvement Program.
3. Fully Funded means there are sufficient funds for construction phase and Partially Funded means that there are insufficient funds for construction phase.
|
For questions or concerns about the project, call the Public Works Department
construction project information line at (619) 533-4207, email
engineering@sandiego.gov,
or
submit your inquiry online.
Please reference the project name in your inquiry.
|
Form PWD1502
|
11/01/2024
|
|
|