The City of San Diego Project Information Details
La Jolla Improv 3 (W)
(Design Bid Build Project)
The City of San Diego
Project Information Details
La Jolla Improv 3 (W)
(Design Bid Build Project)
Print Page  
General Information
B20023 (Water Asset)
The project will replace in place approximately 4,050 linear feet (LF) of 4, 8, 10, and 12 inch diameter water mains; abandon 1,250 LF of 8 inch diameter water main and 1,250 LF of 12 inch diameter water main; and replace in place several fire hydrants. Other project improvements include the installation of a new pressure reduction station, new curb ramps that meet Americans with Disabilities Act (ADA) standards, and 4,050 LF of asphalt concrete (AC) overlay and concrete pavement replacement.
Narvaez, Rex
1
LA JOLLA
Project Location Map: Click Here
Estimated Project Schedule(1)
Use mouse wheel to zoom in and out of timeline.
Schedule to be determined.
If timeline does not show, please click here for instructions on how to resolve this.
 
Estimated Project Dollar Amount(1)   
(1) $7,210,067
Construction Activity
(1) $5,000,000
(3) Partially Funded
To Be Selected
(1) Duration to be determined.
Additional Remarks
None
Notes:
1. The cost and schedule data shown here are the City’s current best estimates and subject to frequent change. Changes (if any) are updated once a month.
2. To learn more about Capital Improvement Projects, visit: The Citizens Guide to the Capital Improvement Program.
3. Fully Funded means there are sufficient funds for construction phase and Partially Funded means that there are insufficient funds for construction phase.
For questions or concerns about the project, call the Public Works Department construction project information line at (619) 533-4207, email engineering@sandiego.gov, or submit your inquiry online.
Please reference the project name in your inquiry.
Form PWD1502 03/01/2025