Project Information Details
La Jolla Improv 3 (W)
(Design Bid Build Project)
|
|
Project Information Details
|
La Jolla Improv 3 (W)
|
(Design Bid Build Project)
|
Print Page
|
General Information
|
|
B20023
(Water Asset)
|
The project will replace in place approximately 4,050 linear feet (LF) of 4, 8, 10, and 12 inch diameter water mains; abandon 1,250 LF of 8 inch diameter water main and 1,250 LF of 12 inch diameter water main; and replace in place several fire hydrants. Other project improvements include the installation of a new pressure reduction station, new curb ramps that meet Americans with Disabilities Act (ADA) standards, and 4,050 LF of asphalt concrete (AC) overlay and concrete pavement replacement.
|
|
Narvaez, Rex
|
|
1
|
|
|
Project Location Map:
|
Click Here
|
Estimated Project Schedule(1)
Use mouse wheel to zoom in and out of timeline.
|
|
Schedule to be determined.
|
If timeline does not show, please click here for instructions on how to resolve this.
|
|
Estimated Project Dollar Amount(1)
|
(1)
|
$7,210,067
|
Construction Activity
|
(1)
|
$5,000,000
|
(3)
|
Partially Funded
|
|
To Be Selected
|
(1)
|
Duration to be determined.
|
|
|
Notes:
1. The cost and schedule data shown here are the City’s current best estimates and subject to frequent change. Changes (if any) are updated once a month.
2. To learn more about Capital Improvement Projects, visit:
The Citizens Guide to the Capital Improvement Program.
3. Fully Funded means there are sufficient funds for construction phase and Partially Funded means that there are insufficient funds for construction phase.
|
For questions or concerns about the project, call the Public Works Department
construction project information line at (619) 533-4207, email
engineering@sandiego.gov,
or
submit your inquiry online.
Please reference the project name in your inquiry.
|
Form PWD1502
|
03/01/2025
|
|
|