The City of San Diego Project Information Details
Clairemont Mesa West Improv 1 (W)
(Design Bid Build Project)
The City of San Diego
Project Information Details
Clairemont Mesa West Improv 1 (W)
(Design Bid Build Project)
Print Page  
General Information
B20032 (Water Asset)
Construction of Clairemont Mesa West Improvement 1 consist of the replacement of approximately 5,152 LF of 8-inch existing VC & PVC sewer mains with 8" & 10" PVC sewer mains and rehabilitation of 2,257 LF of 8-inch VC sewer mains including associated sewer lateral and manholes. The project also includes replacement of approximately 339 LF of 4- & 6-inch existing AC water mains with new appropriately sized PVC water mains including associated water services, trench and pavement resurfacing, curb
Ashrafzadeh, Mastaneh
2
CLAIREMONT MESA
Project Location Map: Click Here
Estimated Project Schedule(1)
Use mouse wheel to zoom in and out of timeline.
Schedule to be determined.
If timeline does not show, please click here for instructions on how to resolve this.
 
Estimated Project Dollar Amount(1)   
(1) $880,941
Construction Activity
(1) $430,220
(3) Partially Funded
KTA Construction, Inc.
(1) Duration to be determined.
Additional Remarks
None
See B20033 for Sewer Asset Click Here
See B24132 for Transportation Asset Click Here
Notes:
1. The cost and schedule data shown here are the City’s current best estimates and subject to frequent change. Changes (if any) are updated once a month.
2. To learn more about Capital Improvement Projects, visit: The Citizens Guide to the Capital Improvement Program.
3. Fully Funded means there are sufficient funds for construction phase and Partially Funded means that there are insufficient funds for construction phase.
For questions or concerns about the project, call the Public Works Department construction project information line at (619) 533-4207, email engineering@sandiego.gov, or submit your inquiry online.
Please reference the project name in your inquiry.
Form PWD1502 11/01/2024