|
|
Project Information Details
Coast Bl Sea Cave Emerg Stablz Project
(Sole Source Emergency Project)
|
|
Project Information Details
|
Coast Bl Sea Cave Emerg Stablz Project
|
(Sole Source Emergency Project)
|
Print Page
|
General Information
|
|
B20040
(Transportation Asset)
|
The scope of work includes but not limited to design services such as construction drawing plans, design, As-builts, monitoring survey and geotechnical services. Construction services shall include but not limited to temporary rip-rap installation and removal, geofabric sand piles installation and removal, concrete slurry to fill the existing cave and road repair associated with the emergency project.
|
|
Choi, Jong
|
|
1
|
|
|
Project Location Map:
|
Click Here
|
Estimated Project Schedule(1)
Use mouse wheel to zoom in and out of timeline.
|
|
Schedule to be determined.
|
If timeline does not show, please click here for instructions on how to resolve this.
|
|
Estimated Project Dollar Amount(1)
|
(1)
|
$3,553,925
|
Construction Activity
|
(1)
|
$2,708,300
|
(3)
|
Fully Funded
|
|
Flatiron West, Inc
|
(1)
|
10 Months
|
|
|
Notes:
1. The cost and schedule data shown here are the City’s current best estimates and subject to frequent change. Changes (if any) are updated once a month.
2. To learn more about Capital Improvement Projects, visit:
The Citizens Guide to the Capital Improvement Program.
3. Fully Funded means there are sufficient funds for construction phase and Partially Funded means that there are insufficient funds for construction phase.
|
For questions or concerns about the project, call the Public Works Department
construction project information line at (619) 533-4207, email
engineering@sandiego.gov,
or
submit your inquiry online.
Please reference the project name in your inquiry.
|
Form PWD1502
|
11/01/2024
|
|
|