Project Information Details
College West Improv 3 (S)
(Design Bid Build Project)
|
|
Project Information Details
|
College West Improv 3 (S)
|
(Design Bid Build Project)
|
Print Page
|
General Information
|
|
B20085
(Sewer Asset)
|
Construction of 7,777 LF (1.47 miles) of 8-inch, 10-inch, 12-inch, and 15-inch sewer mains to replace existing vitrified clay (VC), concrete (CP) and polyvinyl chloride (PVC) sewer mains. Construction of 2,849 LF (0.54 miles) of new 8-inch and 15-inch sewer mains. Abandonment of 1,987 LF (0.38 miles) of existing VC and CP sewer mains. Rehabilitation of 888 LF (0.17 miles) of existing vitrified clay (VC) sewer mains. Replumb 52 laterals.
|
|
Narvaez, Rex
|
|
9
|
|
|
Project Location Map:
|
Click Here
|
Estimated Project Schedule(1)
Use mouse wheel to zoom in and out of timeline.
|
|
Schedule to be determined.
|
If timeline does not show, please click here for instructions on how to resolve this.
|
|
Estimated Project Dollar Amount(1)
|
(1)
|
$11,509,000
|
Construction Activity
|
(1)
|
$8,048,000
|
(3)
|
Partially Funded
|
|
To be selected
|
(1)
|
Duration to be determined.
|
|
|
See B20084 for Water Asset
Click Here
|
Notes:
1. The cost and schedule data shown here are the City’s current best estimates and subject to frequent change. Changes (if any) are updated once a month.
2. To learn more about Capital Improvement Projects, visit:
The Citizens Guide to the Capital Improvement Program.
3. Fully Funded means there are sufficient funds for construction phase and Partially Funded means that there are insufficient funds for construction phase.
|
For questions or concerns about the project, call the Public Works Department
construction project information line at (619) 533-4207, email
engineering@sandiego.gov,
or
submit your inquiry online.
Please reference the project name in your inquiry.
|
Form PWD1502
|