Buchanan Canyon SM Rpr/Repl Emergency
(Emergency (Std, as-needed) Project)
|
|
Project Information Details
|
Buchanan Canyon SM Rpr/Repl Emergency
|
(Emergency (Std, as-needed) Project)
|
Print Page
|
General Information
|
|
B21080
(Sewer Asset)
|
Provide a temporary bypass to the failed 6-inch sewer main located in Buchanan Canyon. Additional scope of work shall include but not limited to design proposal of replacing the existing 6-inch main, replace approximately 210 feet of 6-inch lined VC main, stabilize and re-vegetate disturbed slope.
|
|
Choi, Jong
|
|
3
|
|
|
Project Location Map:
|
Click Here
|
Estimated Project Schedule(1)
Use mouse wheel to zoom in and out of timeline.
|
|
Schedule to be determined.
|
If timeline does not show, please click here for instructions on how to resolve this.
|
|
Estimated Project Dollar Amount(1)
|
(1)
|
$684,500
|
Construction Activity
|
(1)
|
$375,000
|
(3)
|
Fully Funded
|
|
Orion Construction
|
(1)
|
48 Months
|
|
|
Notes:
1. The cost and schedule data shown here are the City’s current best estimates and subject to frequent change. Changes (if any) are updated once a month.
2. To learn more about Capital Improvement Projects, visit:
The Citizens Guide to the Capital Improvement Program.
3. Fully Funded means there are sufficient funds for construction phase and Partially Funded means that there are insufficient funds for construction phase.
|
For questions or concerns about the project, call the Public Works Department
construction project information line at (619) 533-4207, email
engineering@sandiego.gov,
or
submit your inquiry online.
Please reference the project name in your inquiry.
|
Form PWD1502
|
11/01/2024
|
|
|