Project Information Details
San Carlos Interconnect Trans Pipeline
(Design Bid Build Project)
|
|
Project Information Details
|
San Carlos Interconnect Trans Pipeline
|
(Design Bid Build Project)
|
Print Page
|
General Information
|
|
B21109
(Water Asset)
|
Construction of approximately 2,015 linear feet (0.38 mi) of 8, 16 and 24-in water mains to replace existing 10, 20 and 24-inch AC and RCSC water mains via open trench, including all associate water services, fire hydrants, valves, water meters, and other appurtenances. Construction of 5,340 linear feet (1.01 mi) of new water mains via open trench, including all associate water services, fire hydrants, valves, water meters, and other appurtenances. Abandon approximately 1,573 linear feet (0.30 m
|
|
Rubalcava, Eric
|
|
7
|
|
|
Project Location Map:
|
Click Here
|
Estimated Project Schedule(1)
Use mouse wheel to zoom in and out of timeline.
|
|
Schedule to be determined.
|
If timeline does not show, please click here for instructions on how to resolve this.
|
|
Estimated Project Dollar Amount(1)
|
(1)
|
$9,120,900
|
Construction Activity
|
(1)
|
$7,500,000
|
(3)
|
Partially Funded
|
|
To be selected
|
(1)
|
Duration to be determined.
|
|
|
Notes:
1. The cost and schedule data shown here are the City’s current best estimates and subject to frequent change. Changes (if any) are updated once a month.
2. To learn more about Capital Improvement Projects, visit:
The Citizens Guide to the Capital Improvement Program.
3. Fully Funded means there are sufficient funds for construction phase and Partially Funded means that there are insufficient funds for construction phase.
|
For questions or concerns about the project, call the Public Works Department
construction project information line at (619) 533-4207, email
engineering@sandiego.gov,
or
submit your inquiry online.
Please reference the project name in your inquiry.
|
Form PWD1502
|
11/01/2024
|
|
|