|
|
Project Information Details
SV Dam Low Level Outlet Improvements
(Design Bid Build Project)
|
|
Project Information Details
|
SV Dam Low Level Outlet Improvements
|
(Design Bid Build Project)
|
Print Page
|
General Information
|
|
B22002
(Water Asset)
|
There is suspected polyurethane coating failure in the upper section of the San Vicente Dam Low Level Outlet (LLO). The scope of the project is to inspect and perform repairs on the upper section of the San Vicente Dam LLO, which includes the installation of the double isolation (a bulkhead with the existing gate) system in accordance with Occupational Safety and Health Administration (OSHA) regulations in order to perform the inspection and repairs.
|
|
Gibson, William
|
|
Project outside of City limits
|
|
|
Project Location Map:
|
Click Here
|
Estimated Project Schedule(1)
Use mouse wheel to zoom in and out of timeline.
|
|
Schedule to be determined.
|
If timeline does not show, please click here for instructions on how to resolve this.
|
|
Estimated Project Dollar Amount(1)
|
(1)
|
$5,366,555
|
Construction Activity
|
(1)
|
$3,000,000
|
(3)
|
Partially Funded
|
|
To be selected
|
(1)
|
Duration to be determined.
|
|
|
Notes:
1. The cost and schedule data shown here are the City’s current best estimates and subject to frequent change. Changes (if any) are updated once a month.
2. To learn more about Capital Improvement Projects, visit:
The Citizens Guide to the Capital Improvement Program.
3. Fully Funded means there are sufficient funds for construction phase and Partially Funded means that there are insufficient funds for construction phase.
|
For questions or concerns about the project, call the Public Works Department
construction project information line at (619) 533-4207, email
engineering@sandiego.gov,
or
submit your inquiry online.
Please reference the project name in your inquiry.
|
Form PWD1502
|
12/01/2024
|
|
|