|
|
Project Information Details
Azalea Park Improv 2 (W)
(Design Bid Build Project)
|
|
Project Information Details
|
Azalea Park Improv 2 (W)
|
(Design Bid Build Project)
|
Print Page
|
General Information
|
|
B22019
(Water Asset)
|
The project proposes to replace-in-place approximately 9,366 linear feet (1.77 miles) of existing 6-inch, 8-inch and 10-inch asbestos cement (AC) water mains with new 8-inch and 12-inch water mains via open trench construction method, including all associated water services, fire hydrants, valves, water meters, and other appurtenance.
|
|
Narvaez, Rex
|
|
9
|
|
|
Project Location Map:
|
Click Here
|
Estimated Project Schedule(1)
Use mouse wheel to zoom in and out of timeline.
|
|
Schedule to be determined.
|
If timeline does not show, please click here for instructions on how to resolve this.
|
|
Estimated Project Dollar Amount(1)
|
(1)
|
$6,940,000
|
Construction Activity
|
(1)
|
$4,284,900
|
(3)
|
Partially Funded
|
|
To be selected
|
(1)
|
Duration to be determined.
|
|
|
Notes:
1. The cost and schedule data shown here are the City’s current best estimates and subject to frequent change. Changes (if any) are updated once a month.
2. To learn more about Capital Improvement Projects, visit:
The Citizens Guide to the Capital Improvement Program.
3. Fully Funded means there are sufficient funds for construction phase and Partially Funded means that there are insufficient funds for construction phase.
|
For questions or concerns about the project, call the Public Works Department
construction project information line at (619) 533-4207, email
engineering@sandiego.gov,
or
submit your inquiry online.
Please reference the project name in your inquiry.
|
Form PWD1502
|
11/01/2024
|
|
|