Project Information Details
Police HQ Security Fencing
(Design Bid Build Project)
|
|
Project Information Details
|
Police HQ Security Fencing
|
(Design Bid Build Project)
|
Print Page
|
General Information
|
|
B22080
(Buildings Asset)
|
• Primary Funding for design, permitting, and installation of perimeter security fencing. • The fence is proposed to require electricity and data for vehicular and pedestrian gates. • The City will provide Low voltage cabling and connections • The fence is proposed to be approximately 8 feet tall. • The total length of fence line is proposed to be approximately 1600 feet. • The assumed number of fence posts is 161 ﴾one every 10 linear feet﴿ • Each fence post is assumed to require a concrete foun
|
|
Gibson, William
|
|
3
|
|
|
Project Location Map:
|
Click Here
|
Estimated Project Schedule(1)
Use mouse wheel to zoom in and out of timeline.
|
|
Schedule to be determined.
|
If timeline does not show, please click here for instructions on how to resolve this.
|
|
Estimated Project Dollar Amount(1)
|
(1)
|
$2,514,350
|
Construction Activity
|
(1)
|
$1,588,000
|
(3)
|
Fully Funded
|
|
To be selected
|
(1)
|
9 Months
|
|
|
Notes:
1. The cost and schedule data shown here are the City’s current best estimates and subject to frequent change. Changes (if any) are updated once a month.
2. To learn more about Capital Improvement Projects, visit:
The Citizens Guide to the Capital Improvement Program.
3. Fully Funded means there are sufficient funds for construction phase and Partially Funded means that there are insufficient funds for construction phase.
|
For questions or concerns about the project, call the Public Works Department
construction project information line at (619) 533-4207, email
engineering@sandiego.gov,
or
submit your inquiry online.
Please reference the project name in your inquiry.
|
Form PWD1502
|