The City of San Diego Project Information Details
Police HQ Security Fencing
(Design Bid Build Project)
The City of San Diego
Project Information Details
Police HQ Security Fencing
(Design Bid Build Project)
Print Page  
General Information
B22080 (Buildings Asset)
• Primary Funding for design, permitting, and installation of perimeter security fencing.
• The fence is proposed to require electricity and data for vehicular and pedestrian gates.
• The City will provide Low voltage cabling and connections
• The fence is proposed to be approximately 8 feet tall.
• The total length of fence line is proposed to be approximately 1600 feet.
• The assumed number of fence posts is 161 ﴾one every 10 linear feet﴿
• Each fence post is assumed to require a concrete foun
Gibson, William
3
DOWNTOWN
Project Location Map: Click Here
Estimated Project Schedule(1)
Use mouse wheel to zoom in and out of timeline.
Schedule to be determined.
If timeline does not show, please click here for instructions on how to resolve this.
 
Estimated Project Dollar Amount(1)   
(1) $2,514,350
Construction Activity
(1) $1,588,000
(3) Fully Funded
To be selected
(1) 9 Months
Additional Remarks
None
Notes:
1. The cost and schedule data shown here are the City’s current best estimates and subject to frequent change. Changes (if any) are updated once a month.
2. To learn more about Capital Improvement Projects, visit: The Citizens Guide to the Capital Improvement Program.
3. Fully Funded means there are sufficient funds for construction phase and Partially Funded means that there are insufficient funds for construction phase.
For questions or concerns about the project, call the Public Works Department construction project information line at (619) 533-4207, email engineering@sandiego.gov, or submit your inquiry online.
Please reference the project name in your inquiry.
Form PWD1502 11/01/2024