The City of San Diego Project Information Details
Roseville/Fleet Ridge Improv 1 (W)
(Design Build Project)
The City of San Diego
Project Information Details
Roseville/Fleet Ridge Improv 1 (W)
(Design Build Project)
Print Page  
General Information
B22092 (Water Asset)
Replace approx. 5,965 linear feet (1.13 miles) of water mains via open trench, including all associated water services, fire hydrants, valves, water meters, and other appurtenances. [Upsize approximately 29 linear feet of 4-inch asbestos cement (AC) pipe to 8-inch polyvinyl chloride (PVC) pipe, 4,070 linear feet of 6-inch AC and cast iron (CI) pipe to 8-inch PVC, 973 linear feet of 6-inch AC to 12-inch PVC, and 75 linear feet of 8-inch PVC to 12-inch PVC. Replace 818 linear feet of 8-inch
Jaro, Janice
2
PENINSULA
Project Location Map: Click Here
Estimated Project Schedule(1)
Use mouse wheel to zoom in and out of timeline.
Schedule to be determined.
If timeline does not show, please click here for instructions on how to resolve this.
 
Estimated Project Dollar Amount(1)   
(1) $8,040,520
Design-Build Activity
(1) $6,669,520
(3) Partially Funded
To Be Selected
(1) Duration to be determined.
Additional Remarks
None
See B22097 for Sewer Asset Click Here
Notes:
1. The cost and schedule data shown here are the City’s current best estimates and subject to frequent change. Changes (if any) are updated once a month.
2. To learn more about Capital Improvement Projects, visit: The Citizens Guide to the Capital Improvement Program.
3. Fully Funded means there are sufficient funds for construction phase and Partially Funded means that there are insufficient funds for construction phase.
For questions or concerns about the project, call the Public Works Department construction project information line at (619) 533-4207, email engineering@sandiego.gov, or submit your inquiry online.
Please reference the project name in your inquiry.
Form PWD1502 10/01/2024