Roseville/Fleet Ridge Improv 1 (W)
(Design Build Project)
|
|
Project Information Details
|
Roseville/Fleet Ridge Improv 1 (W)
|
(Design Build Project)
|
Print Page
|
General Information
|
|
B22092
(Water Asset)
|
Replace approx. 5,965 linear feet (1.13 miles) of water mains via open trench, including all associated water services, fire hydrants, valves, water meters, and other appurtenances. [Upsize approximately 29 linear feet of 4-inch asbestos cement (AC) pipe to 8-inch polyvinyl chloride (PVC) pipe, 4,070 linear feet of 6-inch AC and cast iron (CI) pipe to 8-inch PVC, 973 linear feet of 6-inch AC to 12-inch PVC, and 75 linear feet of 8-inch PVC to 12-inch PVC. Replace 818 linear feet of 8-inch
|
|
Jaro, Janice
|
|
2
|
|
|
Project Location Map:
|
Click Here
|
Estimated Project Schedule(1)
Use mouse wheel to zoom in and out of timeline.
|
|
Schedule to be determined.
|
If timeline does not show, please click here for instructions on how to resolve this.
|
|
Estimated Project Dollar Amount(1)
|
(1)
|
$11,440,940
|
Design-Build Activity
|
(1)
|
$10,069,940
|
(3)
|
Partially Funded
|
|
To Be Selected
|
(1)
|
Duration to be determined.
|
|
|
See B22097 for Sewer Asset
Click Here
|
Notes:
1. The cost and schedule data shown here are the City’s current best estimates and subject to frequent change. Changes (if any) are updated once a month.
2. To learn more about Capital Improvement Projects, visit:
The Citizens Guide to the Capital Improvement Program.
3. Fully Funded means there are sufficient funds for construction phase and Partially Funded means that there are insufficient funds for construction phase.
|
For questions or concerns about the project, call the Public Works Department
construction project information line at (619) 533-4207, email
engineering@sandiego.gov,
or
submit your inquiry online.
Please reference the project name in your inquiry.
|
Form PWD1502
|
11/01/2024
|
|
|