The City of San Diego Project Information Details
Asphalt Overlay Group 2111 (SS)
(Design Bid Build Project)
The City of San Diego
Project Information Details
Asphalt Overlay Group 2111 (SS)
(Design Bid Build Project)
Print Page  
General Information
B22117 (Transportation Asset)
The project will overlay approximately 4.4 miles of existing roadway with asphalt concrete (AC) pavement; replace existing curb ramps with Americans with Disabilities Act (ADA) compliant curb ramps, cross gutters, and sidewalks; perform subgrade repairs; replace traffic loops, replace road humps; replace bus stop slabs; replace alley aprons; and restripe roadways
Jaro, Janice
3, 8, 9
NORTH PARK, MID-CITY:EASTERN AREA, MID-CITY:CITY HEIGHTS, OTAY MESA, UPTOWN, BALBOA PARK, COLLEGE AREA
Project Location Map: Click Here
Estimated Project Schedule(1)
Use mouse wheel to zoom in and out of timeline.
Schedule to be determined.
If timeline does not show, please click here for instructions on how to resolve this.
 
Estimated Project Dollar Amount(1)   
(1) $5,746,000
Construction Activity
(1) $4,645,129
(3) Fully Funded
Superior Ready Mix Concrete, L.P
(1) 21 Months
Additional Remarks
None
See B21090 for Transportation Asset Click Here
Notes:
1. The cost and schedule data shown here are the City’s current best estimates and subject to frequent change. Changes (if any) are updated once a month.
2. To learn more about Capital Improvement Projects, visit: The Citizens Guide to the Capital Improvement Program.
3. Fully Funded means there are sufficient funds for construction phase and Partially Funded means that there are insufficient funds for construction phase.
For questions or concerns about the project, call the Public Works Department construction project information line at (619) 533-4207, email engineering@sandiego.gov, or submit your inquiry online.
Please reference the project name in your inquiry.
Form PWD1502 03/01/2024