Project Information Details
8690 Aero Drive Roof Replacement
(To Be Determined Project)
|
|
Project Information Details
|
8690 Aero Drive Roof Replacement
|
(To Be Determined Project)
|
Print Page
|
General Information
|
|
B22146
(Airport Asset)
|
This project provides for the roof replacement with induction welding Thermoplastic Polyolefin roofing system with a 20 year Guarantee period. The project also includes; patching over penetrations created from removed HVAC equipment, complete removal of existing roof assembly, sheet metal and trim, storm drain piping specialties; in Building 1, approximately 16,300 square feet.
|
|
Shackelford, Kris
|
|
7
|
|
|
Project Location Map:
|
Click Here
|
Estimated Project Schedule(1)
Use mouse wheel to zoom in and out of timeline.
|
|
Schedule to be determined.
|
If timeline does not show, please click here for instructions on how to resolve this.
|
|
Estimated Project Dollar Amount(1)
|
(1)
|
$755,000
|
Construction Activity
|
(1)
|
$612,000
|
(3)
|
Fully Funded
|
|
To Be Selected
|
(1)
|
9 Months
|
|
|
Notes:
1. The cost and schedule data shown here are the City’s current best estimates and subject to frequent change. Changes (if any) are updated once a month.
2. To learn more about Capital Improvement Projects, visit:
The Citizens Guide to the Capital Improvement Program.
3. Fully Funded means there are sufficient funds for construction phase and Partially Funded means that there are insufficient funds for construction phase.
|
For questions or concerns about the project, call the Public Works Department
construction project information line at (619) 533-4207, email
engineering@sandiego.gov,
or
submit your inquiry online.
Please reference the project name in your inquiry.
|
Form PWD1502
|
12/01/2024
|
|
|