Project Information Details
2870 Mobley St SD Replacement
(Job Order Contract Project)
|
|
Project Information Details
|
2870 Mobley St SD Replacement
|
(Job Order Contract Project)
|
Print Page
|
General Information
|
|
B22153
(Storm Water Drainage Asset)
|
The project will consist of the removal of 125 linear feet of 18” wide corrugated metal pipe, and replacing them it with 332 linear feet of new 18” reinforced concrete piping, a concrete energy dissipater, rip-rap, and a 3 new cleanouts. The project will require the clearing and grubbing of vegetation in the project area, revegetation, repair of sinkhole and erosion at 2870 and 2884 Mobley Street. Temporary and permanent easement acquisitions for the storm drain extension and construction.
|
|
Sleiman, Alex
|
|
7
|
|
|
Project Location Map:
|
Click Here
|
Estimated Project Schedule(1)
Use mouse wheel to zoom in and out of timeline.
|
|
Schedule to be determined.
|
If timeline does not show, please click here for instructions on how to resolve this.
|
|
Estimated Project Dollar Amount(1)
|
(1)
|
$4,329,266
|
Construction Activity
|
(1)
|
$3,024,857
|
(3)
|
Fully Funded
|
|
KTA Construction, Inc.
|
(1)
|
36 Months
|
|
|
Notes:
1. The cost and schedule data shown here are the City’s current best estimates and subject to frequent change. Changes (if any) are updated once a month.
2. To learn more about Capital Improvement Projects, visit:
The Citizens Guide to the Capital Improvement Program.
3. Fully Funded means there are sufficient funds for construction phase and Partially Funded means that there are insufficient funds for construction phase.
|
For questions or concerns about the project, call the Public Works Department
construction project information line at (619) 533-4207, email
engineering@sandiego.gov,
or
submit your inquiry online.
Please reference the project name in your inquiry.
|
Form PWD1502
|
11/01/2024
|
|
|