The City of San Diego Project Information Details
10210 Campus Point Drive SD Emergency
(Emergency (Std, as-needed) Project)
The City of San Diego
Project Information Details
10210 Campus Point Drive SD Emergency
(Emergency (Std, as-needed) Project)
Print Page  
General Information
B23052 (Storm Water Drainage Asset)
Repair/replacement of 40 feet section of the existing 18-inch CMP, and repair of approximately 30 feet by 10 feet void under the roadway caused by the failed storm drainpipe, and/or as directed by the Resident Engineer.
Choi, Jong
6
UNIVERSITY
Project Location Map: Click Here
Estimated Project Schedule(1)
Use mouse wheel to zoom in and out of timeline.
Schedule to be determined.
If timeline does not show, please click here for instructions on how to resolve this.
 
Estimated Project Dollar Amount(1)   
(1) $529,145
Construction Activity
(1) $450,000
(3) Fully Funded
Burtech Pipeline, Incorporated
(1) 11 Months
Additional Remarks
None
Notes:
1. The cost and schedule data shown here are the City’s current best estimates and subject to frequent change. Changes (if any) are updated once a month.
2. To learn more about Capital Improvement Projects, visit: The Citizens Guide to the Capital Improvement Program.
3. Fully Funded means there are sufficient funds for construction phase and Partially Funded means that there are insufficient funds for construction phase.
For questions or concerns about the project, call the Public Works Department construction project information line at (619) 533-4207, email engineering@sandiego.gov, or submit your inquiry online.
Please reference the project name in your inquiry.
Form PWD1502 11/01/2024