The City of San Diego Project Information Details
Aldine Dr Storm Drain Emergency
(Emergency (Std, as-needed) Project)
The City of San Diego
Project Information Details
Aldine Dr Storm Drain Emergency
(Emergency (Std, as-needed) Project)
Print Page  
General Information
B23134 (Storm Water Drainage Asset)
Work consists of abandoning approximately 80 feet of a 12-inch corrugated metal pipe (CMP) and install approximately 722 linear feet of new 18-inch RCP storm drain and headwalls, cleanouts, energy dissipator, and riprap at outfall.
Choi, Jong
9
MID-CITY:KENSINGTON-TALMADGE
Project Location Map: Click Here
Estimated Project Schedule(1)
Use mouse wheel to zoom in and out of timeline.
Schedule to be determined.
If timeline does not show, please click here for instructions on how to resolve this.
 
Estimated Project Dollar Amount(1)   
(1) $1,780,000
Construction Activity
(1) $1,200,000
(3) Fully Funded
KTA Construction, Inc.
(1) 36 Months
Additional Remarks
None
Notes:
1. The cost and schedule data shown here are the City’s current best estimates and subject to frequent change. Changes (if any) are updated once a month.
2. To learn more about Capital Improvement Projects, visit: The Citizens Guide to the Capital Improvement Program.
3. Fully Funded means there are sufficient funds for construction phase and Partially Funded means that there are insufficient funds for construction phase.
For questions or concerns about the project, call the Public Works Department construction project information line at (619) 533-4207, email engineering@sandiego.gov, or submit your inquiry online.
Please reference the project name in your inquiry.
Form PWD1502 04/01/2024