General Information
B23136 (Water Asset)
The Miramar Reservoir Recreation Facility float access and ramp retrofit is needed to accommodate the increase in the Miramar Reservoir high water level once the expanded Miramar Water Treatment Plant (WTP) begins operations for the Pure Water Phase 1 system. The Miramar Reservoir currently has an average water level Of EL 706-feet. When Pure Water Phase 1 begins operations, the proposed/improved Miramar WTP will discharge effluent to increase the water level to EL 712-feet
Martin, Reyhaneh
5
SCRIPPS MIRAMAR RANCH
Project Location Map: Click Here
Estimated Project Schedule(1)
Use mouse wheel to zoom in and out of timeline.
Schedule to be determined.
If timeline does not show, please click here for instructions on how to resolve this.
 
Estimated Project Dollar Amount(1)   
(1) $2,204,000
Construction Activity
(1) $1,300,000
(3) Partially Funded
To Be Selected
(1) Duration to be determined.
Additional Remarks
None
Notes:
1. The cost and schedule data shown here are the City’s current best estimates and subject to frequent change. Changes (if any) are updated once a month.
2. To learn more about Capital Improvement Projects, visit: The Citizens Guide to the Capital Improvement Program.
3. Fully Funded means there are sufficient funds for construction phase and Partially Funded means that there are insufficient funds for construction phase.
For questions or concerns about the project, call the Public Works Department construction project information line at (619) 533-4207, email engineering@sandiego.gov, or submit your inquiry online.
Please reference the project name in your inquiry.
Form PWD1502 11/01/2024