Project Information Details
Miramar Reservoir Recreation Facilities
(Design Bid Build Project)
|
|
Project Information Details
|
Miramar Reservoir Recreation Facilities
|
(Design Bid Build Project)
|
Print Page
|
General Information
|
|
B23136
(Water Asset)
|
The Miramar Reservoir Recreation Facility float access and ramp retrofit is needed to accommodate the increase in the Miramar Reservoir high water level once the expanded Miramar Water Treatment Plant (WTP) begins operations for the Pure Water Phase 1 system. The Miramar Reservoir currently has an average water level Of EL 706-feet. When Pure Water Phase 1 begins operations, the proposed/improved Miramar WTP will discharge effluent to increase the water level to EL 712-feet
|
|
Martin, Reyhaneh
|
|
5
|
|
|
Project Location Map:
|
Click Here
|
Estimated Project Schedule(1)
Use mouse wheel to zoom in and out of timeline.
|
|
Schedule to be determined.
|
If timeline does not show, please click here for instructions on how to resolve this.
|
|
Estimated Project Dollar Amount(1)
|
(1)
|
$2,204,000
|
Construction Activity
|
(1)
|
$1,300,000
|
(3)
|
Partially Funded
|
|
To Be Selected
|
(1)
|
Duration to be determined.
|
|
|
Notes:
1. The cost and schedule data shown here are the City’s current best estimates and subject to frequent change. Changes (if any) are updated once a month.
2. To learn more about Capital Improvement Projects, visit:
The Citizens Guide to the Capital Improvement Program.
3. Fully Funded means there are sufficient funds for construction phase and Partially Funded means that there are insufficient funds for construction phase.
|
For questions or concerns about the project, call the Public Works Department
construction project information line at (619) 533-4207, email
engineering@sandiego.gov,
or
submit your inquiry online.
Please reference the project name in your inquiry.
|
Form PWD1502
|
11/01/2024
|
|
|