Project Information Details
AC Overlay Group 2402
(Design Bid Build Project)
|
|
Project Information Details
|
AC Overlay Group 2402
|
(Design Bid Build Project)
|
Print Page
|
General Information
|
|
B24012
(Transportation Asset)
|
The project scope shall include paving approximately 10.87 miles of existing AC. The project would also include the following improvements: curb ramps, cross gutter, curb and gutter replacement, sidewalks, loops, utility adjustments including sewer manholes, storm drains, water valves, survey monuments, outside utility valves, etc. along the 10.87 miles. Community Planning area: Carmel Valley, La Jolla, Via De La Valle, Rancho Penasquitos. Council District: 1 and 5
|
|
Jaro, Janice
|
|
1, 6, 5, 2
|
|
|
Project Location Map:
|
Click Here
|
Estimated Project Schedule(1)
Use mouse wheel to zoom in and out of timeline.
|
|
Schedule to be determined.
|
If timeline does not show, please click here for instructions on how to resolve this.
|
|
Estimated Project Dollar Amount(1)
|
(1)
|
$23,000,000
|
Construction Activity
|
(1)
|
$16,488,930
|
(3)
|
Partially Funded
|
|
ATP Engineering Contractors
|
(1)
|
Duration to be determined.
|
|
|
Notes:
1. The cost and schedule data shown here are the City’s current best estimates and subject to frequent change. Changes (if any) are updated once a month.
2. To learn more about Capital Improvement Projects, visit:
The Citizens Guide to the Capital Improvement Program.
3. Fully Funded means there are sufficient funds for construction phase and Partially Funded means that there are insufficient funds for construction phase.
|
For questions or concerns about the project, call the Public Works Department
construction project information line at (619) 533-4207, email
engineering@sandiego.gov,
or
submit your inquiry online.
Please reference the project name in your inquiry.
|
Form PWD1502
|
11/01/2024
|
|
|