|
|
Project Information Details
Paradise Hills Improv 2 (W)
(Design Build Project)
|
|
Project Information Details
|
Paradise Hills Improv 2 (W)
|
(Design Build Project)
|
Print Page
|
General Information
|
|
B24044
(Water Asset)
|
Water Main: Replace approximately 13,155 LF (2.50 mi) of existing 6-in, 8-in, and 12-in asbestos cement (AC) and cast iron (CI) water mains with appropriately sized mains.
Transportation: Replace in kind the existing bicycle facility along Potomac Street between Sea Breeze Drive and Calle Serena (Class III WB/Class II EB) and install new bicycle facilities (Class III WB/Class II EB) along Potomac Street between Sea Breeze Drive and Rancho Drive (0.38 miles).
|
|
Ramos-Banuelos, Jaime
|
|
4
|
|
|
Project Location Map:
|
Click Here
|
Estimated Project Schedule(1)
Use mouse wheel to zoom in and out of timeline.
|
|
Schedule to be determined.
|
If timeline does not show, please click here for instructions on how to resolve this.
|
|
Estimated Project Dollar Amount(1)
|
(1)
|
$19,559,000
|
Design-Build Activity
|
(1)
|
$13,513,770
|
(3)
|
Partially Funded
|
|
To Be Selected
|
(1)
|
Duration to be determined.
|
|
|
Notes:
1. The cost and schedule data shown here are the City’s current best estimates and subject to frequent change. Changes (if any) are updated once a month.
2. To learn more about Capital Improvement Projects, visit:
The Citizens Guide to the Capital Improvement Program.
3. Fully Funded means there are sufficient funds for construction phase and Partially Funded means that there are insufficient funds for construction phase.
|
For questions or concerns about the project, call the Public Works Department
construction project information line at (619) 533-4207, email
engineering@sandiego.gov,
or
submit your inquiry online.
Please reference the project name in your inquiry.
|
Form PWD1502
|
11/01/2024
|
|
|