Madrone Ave Pipe Replacement
(Job Order Contract Project)
The City of San Diego
Project Information Details
Madrone Ave Pipe Replacement
(Job Order Contract Project)
Print Page  
General Information
B25074 (Water Asset)
This project will be accelerated to improve water quality and address the structural integrity of the existing pipe. This project will replace the 2" wrought iron water pipe (FSN 455274) and the 2" galvanized water pipe (FSN 455430) to 8" PVC water pipe, and install a new fire hydrant. The replacement of the 2-inch can either be from the existing main on 65th Street or existing stub out from Woodman Ave.
Veverka, Matthew
4
ENCANTO NEIGHBORHOODS
Project Location Map: Click Here
Estimated Project Schedule(1)
Use mouse wheel to zoom in and out of timeline.
Schedule to be determined.
If timeline does not show, please click here for instructions on how to resolve this.
 
Estimated Project Dollar Amount(1)   
(1) Costs to be determined.
Construction Activity
(1) To be determined
(3) Partially Funded
To Be Selected
(1) Duration to be determined.
Additional Remarks
The project is in the preliminary engineering phase and therefore, project’s estimates and schedules are preliminary and subject to change
Notes:
1. The cost and schedule data shown here are the City’s current best estimates and subject to frequent change. Changes (if any) are updated once a month.
2. To learn more about Capital Improvement Projects, visit: The Citizens Guide to the Capital Improvement Program.
3. Fully Funded means there are sufficient funds for construction phase and Partially Funded means that there are insufficient funds for construction phase.
For questions or concerns about the project, call the Public Works Department construction project information line at (619) 533-4207, email engineering@sandiego.gov, or submit your inquiry online.
Please reference the project name in your inquiry.