|
|
Project Information Details
Chollas Paint Booth
(Job Order Contract Project)
|
|
Project Information Details
|
Chollas Paint Booth
|
(Job Order Contract Project)
|
Print Page
|
General Information
|
|
L14002.5
(Buildings Asset)
|
The project scope is replace existing Paint Booth build in the 1960s that is inside and integrated in shop facilities. Overall dimensions ~24’ wide / 20’ high / 50’ long. Expect abatement requirements, structural alterations due to exhaust/intake systems, potential upgrades to electrical, gas line connection, water supply for fire protection system, and excavation of concrete to install required reinforcement for the new booth.
|
|
Gibson, William
|
|
4
|
|
|
Project Location Map:
|
Click Here
|
Estimated Project Schedule(1)
Use mouse wheel to zoom in and out of timeline.
|
|
Schedule to be determined.
|
If timeline does not show, please click here for instructions on how to resolve this.
|
|
Estimated Project Dollar Amount(1)
|
(1)
|
$1,476,000
|
Construction Activity
|
(1)
|
$979,321
|
(3)
|
Fully Funded
|
|
Exbon Development Inc.
|
(1)
|
22 Months
|
|
|
Notes:
1. The cost and schedule data shown here are the City’s current best estimates and subject to frequent change. Changes (if any) are updated once a month.
2. To learn more about Capital Improvement Projects, visit:
The Citizens Guide to the Capital Improvement Program.
3. Fully Funded means there are sufficient funds for construction phase and Partially Funded means that there are insufficient funds for construction phase.
|
For questions or concerns about the project, call the Public Works Department
construction project information line at (619) 533-4207, email
engineering@sandiego.gov,
or
submit your inquiry online.
Please reference the project name in your inquiry.
|
Form PWD1502
|
11/01/2024
|
|
|