Project Information Details
Sunset Cliffs Nat Pk Ph 2 Trail & Reveg
(Design Bid Build Project)
|
|
Project Information Details
|
Sunset Cliffs Nat Pk Ph 2 Trail & Reveg
|
(Design Bid Build Project)
|
Print Page
|
General Information
|
|
L16001.2
(Parks Asset)
|
This project includes the re vegetation of the Sunset Cliffs Natural Park – Hillside Section. This re vegetation effort includes the improvements of existing trails; the adaption of one existing trail to be ADA compliant; installation of overlooks, benches, and interpretive signs; closure of tertiary, or “spider”, trails; regrading of the old ball field; installation of a pedestrian bridge to cross Cretaceous Canyon; removal of non-native, invasive plant species and the replanting of disturbed
|
|
Oliver, Kevin
|
|
2
|
|
|
Project Location Map:
|
Click Here
|
Estimated Project Schedule(1)
Use mouse wheel to zoom in and out of timeline.
|
|
Schedule to be determined.
|
If timeline does not show, please click here for instructions on how to resolve this.
|
|
Estimated Project Dollar Amount(1)
|
(1)
|
$3,513,223
|
Construction Activity
|
(1)
|
$3,029,413
|
(3)
|
Fully Funded
|
|
Ral Investment Corp
|
(1)
|
32 Months
|
|
|
Notes:
1. The cost and schedule data shown here are the City’s current best estimates and subject to frequent change. Changes (if any) are updated once a month.
2. To learn more about Capital Improvement Projects, visit:
The Citizens Guide to the Capital Improvement Program.
3. Fully Funded means there are sufficient funds for construction phase and Partially Funded means that there are insufficient funds for construction phase.
|
For questions or concerns about the project, call the Public Works Department
construction project information line at (619) 533-4207, email
engineering@sandiego.gov,
or
submit your inquiry online.
Please reference the project name in your inquiry.
|
Form PWD1502
|
11/01/2024
|
|
|