The City of San Diego Project Information Details
Carmel Country Road Low Flow Channel
(Design Bid Build Project)
The City of San Diego
Project Information Details
Carmel Country Road Low Flow Channel
(Design Bid Build Project)
Print Page  
General Information
S00969 (Storm Water Drainage Asset)
This project was initially going to raise the elevation of the existing bike path crossing over Carmel creek to mitigate flooding and stagnant water for health and safety concerns. It was determined this solution was not treating the underlying issue in the area which was the stormwater management. TetraTech conducted an assessment in 2011 which had four proposed solutions - one of which will be assessed in a Preliminary Design Report by HDR.
Salvani, Anthony
1
CARMEL VALLEY
Project Location Map: Click Here
Estimated Project Schedule(1)
Use mouse wheel to zoom in and out of timeline.
Schedule to be determined.
If timeline does not show, please click here for instructions on how to resolve this.
 
Estimated Project Dollar Amount(1)   
(1) $6,849,729
Construction Activity
(1) $2,872,402
(3) Partially Funded
To Be Selected
(1) Duration to be determined.
Additional Remarks
None
Notes:
1. The cost and schedule data shown here are the City’s current best estimates and subject to frequent change. Changes (if any) are updated once a month.
2. To learn more about Capital Improvement Projects, visit: The Citizens Guide to the Capital Improvement Program.
3. Fully Funded means there are sufficient funds for construction phase and Partially Funded means that there are insufficient funds for construction phase.
For questions or concerns about the project, call the Public Works Department construction project information line at (619) 533-4207, email engineering@sandiego.gov, or submit your inquiry online.
Please reference the project name in your inquiry.
Form PWD1502 11/01/2024