The City of San Diego Project Information Details
El Monte Pipeline No. 2
(Design Bid Build Project)
The City of San Diego
Project Information Details
El Monte Pipeline No. 2
(Design Bid Build Project)
Print Page  
General Information
S10008 (Water Asset)
The El Monte Pipeline is approximately 12.2 miles and consists of 48-inch and 68-inch reinforced concrete steel cylinder (RCSC) pipe, 68-inch reinforced concrete pipe (RCP), and 72-inch cast-in-place reinforced concrete liner (RCL) through a tunnel portion. Replace in place of 47 LF of existing 48-inch RCSC pipe and 313 LF of existing 68-inch RCP pipe; install 2 each, 6-inch blow-off assembly; extend manways (28 each) to surface; replace seat on valve V40 and replace venturi meter.
Rubalcava, Eric
7
NAVAJO
Project Location Map: Click Here
Estimated Project Schedule(1)
Use mouse wheel to zoom in and out of timeline.
Schedule to be determined.
If timeline does not show, please click here for instructions on how to resolve this.
 
Estimated Project Dollar Amount(1)   
(1) $92,099,966
Construction Activity
(1) $74,000,000
(3) Partially Funded
To be selected
(1) Duration to be determined.
Additional Remarks
None
Notes:
1. The cost and schedule data shown here are the City’s current best estimates and subject to frequent change. Changes (if any) are updated once a month.
2. To learn more about Capital Improvement Projects, visit: The Citizens Guide to the Capital Improvement Program.
3. Fully Funded means there are sufficient funds for construction phase and Partially Funded means that there are insufficient funds for construction phase.
For questions or concerns about the project, call the Public Works Department construction project information line at (619) 533-4207, email engineering@sandiego.gov, or submit your inquiry online.
Please reference the project name in your inquiry.
Form PWD1502 11/01/2024