Camino del Este Path Xing Improvements
(Design Bid Build Project)
The City of San Diego
Project Information Details
Camino del Este Path Xing Improvements
(Design Bid Build Project)
Print Page  
General Information
B13088 (Transportation Asset)
The scope of work includes installation of two (2) High Intensity Activated crosswalks (Hawks) on Camino Del Este at the intersections with the northern bank and southern bank bike paths (along San Diego River). These installations will include a street lighting system at each crossing, pedestrian push buttons, a vehicle detection system, crosswalk and pedestrian curb ramps.
Zhang, Dayue
3
MISSION VALLEY
Project Location Map: Click Here
Estimated Project Schedule(1)
Use mouse wheel to zoom in and out of timeline.
Schedule to be determined.
If timeline does not show, please click here for instructions on how to resolve this.
 
Estimated Project Dollar Amount(1)   
(1) $934,105
Construction Activity
(1) $424,661
(3) Fully Funded
HMS Construction, Inc.
(1) 39 Months
Additional Remarks
None
Notes:
1. The cost and schedule data shown here are the City’s current best estimates and subject to frequent change. Changes (if any) are updated once a month.
2. To learn more about Capital Improvement Projects, visit: The Citizens Guide to the Capital Improvement Program.
3. Fully Funded means there are sufficient funds for construction phase and Partially Funded means that there are insufficient funds for construction phase.