|
|
Project Information Details
Green Infrastructure Group 1024
(Design Bid Build Project)
|
|
Project Information Details
|
Green Infrastructure Group 1024
|
(Design Bid Build Project)
|
Print Page
|
General Information
|
|
B15102
(Storm Water Drainage Asset)
|
Capture runoff from the two drainage areas and treat the 0.5 inches storm. No particular BMP is preferred. Construction is limited to the ROW and City-Owned Parcels.
|
|
Straughn, Jayna
|
|
4
|
|
|
Project Location Map:
|
Click Here
|
Estimated Project Schedule(1)
Use mouse wheel to zoom in and out of timeline.
|
|
Schedule to be determined.
|
If timeline does not show, please click here for instructions on how to resolve this.
|
|
Estimated Project Dollar Amount(1)
|
(1)
|
$3,001,500
|
Construction Activity
|
(1)
|
$1,313,599
|
(3)
|
Partially Funded
|
|
To Be Selected
|
(1)
|
Duration to be determined.
|
|
|
Notes:
1. The cost and schedule data shown here are the City’s current best estimates and subject to frequent change. Changes (if any) are updated once a month.
2. To learn more about Capital Improvement Projects, visit:
The Citizens Guide to the Capital Improvement Program.
3. Fully Funded means there are sufficient funds for construction phase and Partially Funded means that there are insufficient funds for construction phase.
|
For questions or concerns about the project, call the Public Works Department
construction project information line at (619) 533-4207, email
engineering@sandiego.gov,
or
submit your inquiry online.
Please reference the project name in your inquiry.
|
Form PWD1502
|
11/01/2024
|
|
|