|
|
Project Information Details
El Cerrito & Rolando Park SD & GI (SD)
(Design Bid Build Project)
|
|
Project Information Details
|
El Cerrito & Rolando Park SD & GI (SD)
|
(Design Bid Build Project)
|
Print Page
|
General Information
|
|
B15167
(Storm Water Drainage Asset)
|
This project will be replacing Corrugated Metal Pipe (CMP) storm drains in poor condition at the intersection of College Avenue and University and in an adjacent residential neighborhood. The pipes will be replaced with appropriately sized Reinforced Concrete Pipe (RCP). The work will include pavement replacement impacted from the construction work. In addition to the pipe modifications above, a new RCP stormdrain will be installed starting at the inlet in front of 4147 & 4143 Vista Grande Dr.
|
|
Dastgheibi, Sara
|
|
9
|
|
|
Project Location Map:
|
Click Here
|
Estimated Project Schedule(1)
Use mouse wheel to zoom in and out of timeline.
|
|
Schedule to be determined.
|
If timeline does not show, please click here for instructions on how to resolve this.
|
|
Estimated Project Dollar Amount(1)
|
(1)
|
$13,856,245
|
Construction Activity
|
(1)
|
$7,667,829
|
(3)
|
Partially Funded
|
|
To Be Selected
|
(1)
|
Duration to be determined.
|
|
|
Notes:
1. The cost and schedule data shown here are the City’s current best estimates and subject to frequent change. Changes (if any) are updated once a month.
2. To learn more about Capital Improvement Projects, visit:
The Citizens Guide to the Capital Improvement Program.
3. Fully Funded means there are sufficient funds for construction phase and Partially Funded means that there are insufficient funds for construction phase.
|
For questions or concerns about the project, call the Public Works Department
construction project information line at (619) 533-4207, email
engineering@sandiego.gov,
or
submit your inquiry online.
Please reference the project name in your inquiry.
|
Form PWD1502
|
10/01/2024
|
|
|