The City of San Diego Project Information Details
Tecolote Cyn GC Water Conn
(Design Bid Build Project)
The City of San Diego
Project Information Details
Tecolote Cyn GC Water Conn
(Design Bid Build Project)
Print Page  
General Information
B15203 (Water Asset)
Water service connection located in the Golf course that includes installing 700 LF of 16-inch main C905 PVC DR21 Pressure Rated 200 psi; 2-4” water services and 1-6” water services.
Narvaez, Rex
7, 2
LINDA VISTA, CLAIREMONT MESA
Project Location Map: Click Here
Estimated Project Schedule(1)
Use mouse wheel to zoom in and out of timeline.
Schedule to be determined.
If timeline does not show, please click here for instructions on how to resolve this.
 
Estimated Project Dollar Amount(1)   
(1) $685,500
Construction Activity
(1) $450,000
(3) Partially Funded
To Be Selected
(1) Duration to be determined.
Additional Remarks
None
See S15020 for Sewer Asset Click Here
Notes:
1. The cost and schedule data shown here are the City’s current best estimates and subject to frequent change. Changes (if any) are updated once a month.
2. To learn more about Capital Improvement Projects, visit: The Citizens Guide to the Capital Improvement Program.
3. Fully Funded means there are sufficient funds for construction phase and Partially Funded means that there are insufficient funds for construction phase.
For questions or concerns about the project, call the Public Works Department construction project information line at (619) 533-4207, email engineering@sandiego.gov, or submit your inquiry online.
Please reference the project name in your inquiry.
Form PWD1502 04/01/2024