The City of San Diego Project Information Details
AC Water & Sewer Group 1018 (S)
(Design Bid Build Project)
The City of San Diego
Project Information Details
AC Water & Sewer Group 1018 (S)
(Design Bid Build Project)
Print Page  
General Information
B16106 (Sewer Asset)
Construct and install a total of 10,260 LF (1.943 miles) of water mains to
replace existing asbestos cement (AC) water mains, including all associated water services, fire hydrants, curb ramps, traffic signal modification at the intersection of Mission Boulevard and Pacific Beach Drive, traffic control, etc. Construct a total of 478 LF (0.10 miles) of sewer mains to replace existing vitrified clay (VC) sewer main and rehab a total of 1,953 LF (0.37 miles) of existing ductile iron (DI) sewer main
Ramos-Banuelos, Jaime
2
MISSION BEACH
Project Location Map: Click Here
Estimated Project Schedule(1)
Use mouse wheel to zoom in and out of timeline.
Schedule to be determined.
If timeline does not show, please click here for instructions on how to resolve this.
 
Estimated Project Dollar Amount(1)   
(1) $3,631,946
Construction Activity
(1) $2,810,731
(3) Fully Funded
Orion Construction
(1) 74 Months
Additional Remarks
None
See B21087 for Transportation Asset Click Here
See B16081 for Water Asset Click Here
Notes:
1. The cost and schedule data shown here are the City’s current best estimates and subject to frequent change. Changes (if any) are updated once a month.
2. To learn more about Capital Improvement Projects, visit: The Citizens Guide to the Capital Improvement Program.
3. Fully Funded means there are sufficient funds for construction phase and Partially Funded means that there are insufficient funds for construction phase.
For questions or concerns about the project, call the Public Works Department construction project information line at (619) 533-4207, email engineering@sandiego.gov, or submit your inquiry online.
Please reference the project name in your inquiry.
Form PWD1502 11/01/2024