B16106
(Sewer Asset)
|
Construct and install a total of 10,260 LF (1.943 miles) of water mains to replace existing asbestos cement (AC) water mains, including all associated water services, fire hydrants, curb ramps, traffic signal modification at the intersection of Mission Boulevard and Pacific Beach Drive, traffic control, etc. Construct a total of 478 LF (0.10 miles) of sewer mains to replace existing vitrified clay (VC) sewer main and rehab a total of 1,953 LF (0.37 miles) of existing ductile iron (DI) sewer main
|
|
Ramos-Banuelos, Jaime
|
|
2
|
|
|
Project Location Map:
|
Click Here
|
Estimated Project Schedule(1)
Use mouse wheel to zoom in and out of timeline.
|
|
Schedule to be determined.
|
If timeline does not show, please click here for instructions on how to resolve this.
|
|
Estimated Project Dollar Amount(1)
|
(1)
|
$3,631,946
|
Construction Activity
|
(1)
|
$2,810,731
|
(3)
|
Fully Funded
|
|
Orion Construction
|
(1)
|
74 Months
|
|
|
See B21087 for Transportation Asset
Click Here
|
See B16081 for Water Asset
Click Here
|
Notes:
1. The cost and schedule data shown here are the City’s current best estimates and subject to frequent change. Changes (if any) are updated once a month.
2. To learn more about Capital Improvement Projects, visit:
The Citizens Guide to the Capital Improvement Program.
3. Fully Funded means there are sufficient funds for construction phase and Partially Funded means that there are insufficient funds for construction phase.
|
For questions or concerns about the project, call the Public Works Department
construction project information line at (619) 533-4207, email
engineering@sandiego.gov,
or
submit your inquiry online.
Please reference the project name in your inquiry.
|
Form PWD1502
|
11/01/2024
|
|
|